  1. Legacy equipment and Modernization delivery

    Documented record · Earlier risks and modernization

    GAO’s 2024 report assessed system sustainability and modernization of critical systems. It documents that these risks predated the May 2025 program announcement.

    Historical context does not identify the cause of the 2026 incident.

    [28] GAO review of aging air traffic control systems

  2. Modernization delivery and Costs and schedules

    Documented record · Audit findings and agency response

    GAO’s 2026 review linked modernization delivery to the need for complete cost estimates and an integrated schedule. DOT said program estimates and schedules already existed; GAO maintained that costs and dependencies were omitted.

    This is a documented audit finding and response, not an incident-cause finding.

    [6] GAO modernization audit and DOT response

  3. Modernization delivery and SMART rollout

    Official statement · Announced software work

    FAA’s June announcement described work on FMDS and SMART within its modernization effort.

    This records program scope as announced. It does not establish a live connection to equipment affected by the incident.

    [5] FAA ASI contract announcement for FMDS and SMART

  4. Legacy equipment and Communications and radar

    Official statement · Legacy overload explanation

    Duffy attributed inconsistent radar and communications data to overloaded legacy switches and routers and said new IP switches were unaffected.

    An attributed preliminary explanation, not a final technical causal analysis.

    [18] DOT official briefing account

  5. Communications and radar and National ground stop

    Official statement · Reason given for the ground stop

    Duffy said instability in radar and communications prompted the precautionary ground stop. FAA advisories separately document the restriction and cancellation.

    The notices confirm that the ground stop occurred. They do not verify the technical cause described in the briefing.

    [18] DOT official briefing account [16] FAA Advisory 111 national ground stop [17] FAA Advisory 005 national ground stop cancellation

  6. National ground stop and Local effects

    Documented record · Coordination after the national stop

    FAA’s overnight operations plan describes continued coordination and separate airline-requested ground stops after the national restriction was lifted.

    The plan does not quantify local passenger needs, losses or recovery time.

    [27] FAA overnight operations plan

  7. SMART rollout and Human review

    Official statement · Human review as described by FAA

    FAA said staff review SMART recommendations and local leaders may accept or reject them.

    The statement describes a safeguard; operational records are needed to assess its use and effectiveness.

    [8] FAA SMART limited operations launch

  8. SMART rollout and Training and workload

    Official statement · Training during staged rollout

    DOT’s SMART fact sheet described continuing testing, training and assessment as capabilities were introduced.

    A stated process does not establish which staff completed training before a particular rollout stage.

    [9] DOT SMART launch fact sheet

  9. Changes and testing and Legacy equipment

    Official statement · Tentative patching explanation

    Mullin tentatively suggested patches and new technology had overwhelmed older systems. The brief asks whether that account has been confirmed, revised or rejected.

    Tentative official claim. It is not an established change-to-failure relationship.

    [19] Factbase joint briefing transcript [20] White House official briefing recording

  10. Changes and testing and Communications and radar

    Unanswered question · Which changes were relevant

    Which software, configuration or network changes, if any, preceded the first verified fault, and what do logs show?

    A proposed inquiry from the brief. The cited statements explain why it is asked; they do not prove a connection.

    [18] DOT official briefing account [19] Factbase joint briefing transcript

  11. Modernization delivery and Changes and testing

    Unanswered question · What readiness tests established

    Which compatibility, load, backup and rollback tests evaluated the mix of old and new components, and what did acceptance records show?

    A proposed inquiry. No conclusion that testing was missing or inadequate.

    [9] DOT SMART launch fact sheet [18] DOT official briefing account

  12. Human review and Training and workload

    Unanswered question · How oversight worked in practice

    What training and recommendation records show how staff used the system and how it affected workload, decision quality and safety?

    A proposed inquiry. No measured relationship or effect size is supplied by this map.

    [8] FAA SMART limited operations launch [11] Van Hollen congressional pause request and full letter

  13. Modernization delivery and Local effects

    Unanswered question · What was operational locally

    Which upgrades serving a particular airport were installed, tested and accepted, and which external dependencies remained?

    A proposed inquiry. National completion figures cannot establish the readiness of a particular airport.

    [4] DOT Modern Skies public progress website [13] DOT E-IDS deployments and progress figures

About the evidence and this explorer

“Variables” means the factors and topics identified in the brief. This is an editorial guide to the reviewed evidence, not a statistical correlation analysis or a complete technical architecture.

Documented records include operational notices and audit findings. Official statements remain attributed, including preliminary explanations. Unanswered questions identify issues for investigation; the sources explain why a question is asked, not prove a connection. These are hidden on first load.

The selection of topics is editorial. Missing connections do not prove that no relationship exists. Position and line length do not indicate importance or probability. Review cutoff: 14 November 2026, 6:15 a.m. EST / 12:15 p.m. CET. This companion uses Edition 2 and introduces no new incident finding.

Examine the full source register →